In between boiler bay and TG bay control room has been placed at 5.5 M level for ease of operation. This will control effectively with minimum movement of operators. Similar to TG bay control room is also having two floors. In upper floor at a height of 5.5 m all the control units of steam generator, turbine and alternator will be placed. This floor will also be connected with boiler bay by suitable ladder structure with 3.5 m level platform and 5.5 m level platform for smooth operation and better coordination. In the lower level at 0.0 m all the electrical panels will be placed.

The control room will be air-conditioned and ventilated with suitable package unit of Air Conditioning Equipment.
 
 
 
Powered by Sparrow Interactive Pvt Ltd.